REHABILITATING CAST IRON DRAINAGE AT BRISTOL AIRPORT

An innovative renovation operation of suspended cast iron drainage pipes utilised Picote milling machines for cleaning and Brawoliner for pipe rehabilitation at Bristol Airport ensuring the continued full operation of the airport whilst eliminating environmental or disruptive impact on both airline passengers and airport staff. Download the case study below.



CJK Picote Bristol Airport Case study vs
Download • 1.08MB

+44(0)1832 293030

Workshop 3 Hytner park
Bullock Road, Washingley
Peterborough PE7 3SJ, UK

©2020 by C J Kelly International.