Martyn KellyMar 302 minSB Drain Services Ltd, Picote Concrete Cutting Success Mid October 2021, Steve Butler from SB Drain Services undertook a challenging concrete cutting project. The pipe was blocked with...
Martyn KellySep 6, 20211 minJoin us at NO-DIG Live Peterborough14th-16th of September No-Dig Live is the premier event for the trenchless industry, and visiting is a must for anyone involved in installing or refurbishing...
Martyn KellyJun 18, 20214 minRENOVATING VITAL DUCTING AT A CANCER TREATMENT CENTREWe had the pleasure of supporting Metro Rod HLP to complete an interesting project on behalf of the NHS bring to a successful conclusion.
Martyn KellyMay 20, 20211 minPicote Reel Lock UpgradeHere's a quick how to video, for installing the reel brake upgrade from Picote.
Martyn KellyMay 12, 20211 minLet's take a look a the new battery powered mini miller from PicoteMore details can be found here
Martyn KellyOct 9, 20201 minMulti Kit Pipe Repair the choice of DALROD Peterborough Over the summer CJ Kelly International Ltd hosted several training course, one was for the great people at DALROD Peterborough. They have...
Martyn KellyJun 22, 20201 min3 tips for using your Picote / Flexshaft safely Look after your Picote Miller / Flexshaft with these handy tips.
Martyn KellyMay 6, 20201 minREHABILITATING CAST IRON DRAINAGE AT BRISTOL AIRPORTAn innovative renovation operation of suspended cast iron drainage pipes utilised Picote milling machines and brawoliner
Martyn KellyMay 6, 20204 minDALROD UTILISES BRAWOLINER TO COMPLETE A CHALLENGING RENOVATION PROJECT NEAR ELY CATHEDRALThe DALROD team worked tirelessly installing some three (3) Brawoliner sections using both inversion drum and scaffold tower inversion techn
Martyn KellyMar 23, 20201 minFAT REMOVAL WITH PICOTE MAXI MILLER“We were instructed by a food company to remove a large fat build up to pipework running through the middle of a factory. Due to the level o
Martyn KellyMar 23, 20205 minCAST IRON SOLUTION WITH BRAWOLINER® HTThis was a very challenging job, however it went reasonably smoothly as our team had previously worked at this site and had learnt from prev
Martyn KellyMar 23, 20205 minBRAWOLINER HELPS KEEP COLLEGE BUILDINGS DAMP FREEThis liner was selected because it is designed to handle cross-sectional changes within a pipe being lined and so could easily accommodate t
Martyn KellyFeb 8, 20206 minBRAWOLINER® ELIMINATES EXCAVATION ON A CHALLENGING TORQUAY LINING PROJECTThe BRAWOLINER® 3D lining system was recently utilised on a very challenging sewer rehabilitation project which was part of the on-going £1